Michael Tostado
July 6, 2026Googlegot three quotes before going with SLR and they ended up being the only ones who walked me through how the panels would sit on my roof and what the production estimates meant. took maybe 4 weeks between signing and the actual install day. permitting was on them which was good bc i had no idea what to do there. install day itself was quick, two days on the roof and they were done. system has been running fine since